Skip to main content
European Commission logo
European Alternative Fuels Observatory

Lithuania

Target tracker

Member States are obliged to adopt National Policy Framework targets and report the to the European Commission. NPF targets are then set for the deployment of alternative fuels infrastructure in the respective Member State.

The NPF targets for Lithuania for 2025 for infrastructure:

  • 100 Electric Refuelling points
  • 10 CNG Refuelling points
  • 1 LNG Refuelling points

The NIR targets for Lithuania for 2025 for infrastructure:

  • 310 Electric Refuelling points
  • 13 CNG Refuelling points
  • 3 LNG Refuelling points
  • 1 H2 Refuelling points